- Tanggal : 05-Nov-2025 | Pukul : 12:28 , Selamat Siang !!
| Nama Ruas Jalan | 101 - KARANGJATI - KOCORAN |
| No. Jembatan | KB.34.0004.0101.003 |
| Nama Jembatan | POGUNG II |
| Kapanewon | Mlati |
| kmpost | |
| Koordinat | -7.764573, 110.375589 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 5.1 m | 5.1 m | 5.1 m |
| Lebar | 27.5 m | 27.5 m | 27.5 m |
| Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
| Tipe | Pelengkung | Pelengkung | Pelengkung |
| Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
| Kondisi | 1 | 1 | 2 |
Lantai |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Beton tak bertulang | Beton tak bertulang | Beton tak bertulang |
| Kondisi | 1 | 1 | 1 |
Sandaran |
|||
| Bahan 1 | Pasangan batu | Pasangan batu | Pasangan batu |
| Bahan 2 | Pipa baja diisi beton | Pipa baja diisi beton | Pipa baja diisi beton |
| Kondisi | 1 | 1 | 1 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 1 |
KONDISI |
|||
| Nilai Kondisi | 3 (Rusak Berat) | 1 (Rusak Ringan) | 2 (Rusak Sedang) |
| Kerusakan | Besi tulangan plat lengkung berkarat,Endapan lumpur dan sampah berlebih | Penurunan mutu/berkarat pada besi tulangan pelengkung,Endapan/lumpur/sampah pada aliran air | Penurunan mutu/berkarat pada besi tulangan pelengkung,Endapan/lumpur/sampah pada aliran air |
| Penanganan | Rehabilitasi (perbaikan dan /atau perkuatan) | Pemeliharaan Rutin | Pemeliharaan Berkala |