- Tanggal : 05-Nov-2025 | Pukul : 12:38 , Selamat Siang !!
| Nama Ruas Jalan | 106 - REJODANI - GONDANGAN |
| No. Jembatan | KB.34.0004.0106.003 |
| Nama Jembatan | JETIS BARAN |
| Kapanewon | Ngaglik |
| kmpost | |
| Koordinat | -7.714030, 110.398418 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 10.4 m | 10.4 m | 10.4 m |
| Lebar | 5.6 m | 5.6 m | 5.6 m |
| Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
| Tipe | Gelagar komposit, Plat | Gelagar komposit, Plat | Gelagar komposit, Plat |
| Bahan | Baja, Beton bertulang | Baja, Beton bertulang | Baja, Beton bertulang |
| Kondisi | 2 | 3 | 3 |
Lantai |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 2 | 2 | 3 |
Sandaran |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Pipa baja diisi beton | Pipa baja diisi beton | Pipa baja diisi beton |
| Kondisi | 1 | 1 | 1 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 3 |
KONDISI |
|||
| Nilai Kondisi | 2 (Rusak Sedang) | 3 (Rusak Berat) | 3 (Rusak Berat) |
| Kerusakan | Besi tulangan plat dan Besi gelagar komposit berkarat,Lapis permukaan aspal retak, Cat mengelupas | Penurunan mutu/retak/karat pada bangunan plat jembatan,Penurunan mutu/berkarat pada gelagar jembatan | Penurunan mutu/retak/karat pada bangunan plat jembatan,Penurunan mutu/berkarat pada gelagar jembatan |
| Penanganan | Pemeliharaan Berkala | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |