- Tanggal : 01-Dec-2025 | Pukul : 15:29 , Selamat Siang !!
| Nama Ruas Jalan | 130 - TEMPEL - KADISONO |
| No. Jembatan | KB.34.0004.0130.001 |
| Nama Jembatan | MOLODONO |
| Kapanewon | Tempel |
| kmpost | |
| Koordinat | -7.655355, 110.332155 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 3.8 m | 3.8 m | 3.8 m |
| Lebar | 5.1 m | 5.1 m | 5.1 m |
| Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
| Tipe | Pelengkung | Pelengkung | Pelengkung |
| Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
| Kondisi | 1 | 1 | 3 |
Lantai |
|||
| Bahan 1 | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 1 | 1 | 1 |
Sandaran |
|||
| Bahan 1 | Pasangan bata | Pasangan bata | Pasangan bata |
| Bahan 2 | |||
| Kondisi | 1 | 1 | 1 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 2 | 2 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 2 |
KONDISI |
|||
| Nilai Kondisi | 2 (Rusak Sedang) | 3 (Rusak Berat) | 3 (Rusak Berat) |
| Kerusakan | Penurunan mutu Plat lengkung,Cat mengelupas | Penurunan mutu/retak pada bangunan kepala jembatan,Penurunan mutu/retak pada bangunan plat jembatan | Keropos pada pelengkung,Penurunan mutu pasangan batu pondasi |
| Penanganan | Pemeliharaan Berkala | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |