| Nama Ruas Jalan | 132 - SEDOGAN - SEMPU |
| No. Jembatan | KB.34.0004.0132.002 |
| Nama Jembatan | GESIKAN |
| Kapanewon | Tempel |
| kmpost | |
| Koordinat | -7.640578, 110.338098 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 4.6 m | 4.6 m | 4.6 m |
| Lebar | 12.8 m | 12.8 m | 12.8 m |
| Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
| Tipe | Pelengkung | Pelengkung | Pelengkung |
| Bahan | Pasangan bata | Pasangan bata | Pasangan bata |
| Kondisi | 2 | 4 | 4 |
Lantai |
|||
| Bahan 1 | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 2 | 2 | 1 |
Sandaran |
|||
| Bahan 1 | Pasangan bata | Pasangan bata | Pasangan bata |
| Bahan 2 | |||
| Kondisi | 2 | 2 | 1 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 2 | 2 | 2 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 2 | 1 | 3 |
KONDISI |
|||
| Nilai Kondisi | 4 (Kritis) | 4 (Kritis) | 4 (Kritis) |
| Kerusakan | Pelengkung jembatan retak,Lapis permukaan aspal retak, Cat mengelupas | Penurunan mutu/retak pada bangunan pelengkung dan dinding tegak pelengkung,Penurunan mutu/retak pada bangunan kepala jembatan | Retak dan pecah plester pasangan bata,Aspal aus dan retak |
| Penanganan | Rehabilitasi (perkuatan atau penggantian) | Rehabilitasi (perkuatan atau penggantian) | Penggantian |