| Nama Ruas Jalan | 172 - KEMUSUH - KASURAN |
| No. Jembatan | KB.34.0004.0172.002 |
| Nama Jembatan | KAPUKONDO I |
| Kapanewon | Tempel |
| kmpost | |
| Koordinat | -7.701739, 110.291055 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 6.3 m | 6.3 m | 6.3 m |
| Lebar | 9.35 m | 9.35 m | 9.35 m |
| Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
| Tipe | Plat, Pelengkung | Plat, Pelengkung | Plat, Pelengkung |
| Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
| Kondisi | 1 | 2 | 1 |
Lantai |
|||
| Bahan 1 | Tanah biasa/ lempung timbunan, Beton bertulang | Tanah biasa/ lempung timbunan, Beton bertulang | Tanah biasa/ lempung timbunan, Beton bertulang |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 1 | 1 | 1 |
Sandaran |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Pipa baja diisi beton | Pipa baja diisi beton | Pipa baja diisi beton |
| Kondisi | 2 | 2 | 2 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 3 | 3 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 3 |
KONDISI |
|||
| Nilai Kondisi | 3 (Rusak Berat) | 3 (Rusak Berat) | 3 (Rusak Berat) |
| Kerusakan | Penurunan mutu pasangan batu dan retak pada abutment jembatan lama,Penurunan mutu pasangan bata pelengkung jembatan lama | Penurunan mutu/retak pada bangunan kepala jembatan,Penurunan mutu/retak pada bangunan pelengkung | Penurunan mutu/retak pada bangunan kepala jembatan,Penurunan mutu/retak pada bangunan pelengkung |
| Penanganan | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |