- Tanggal : 01-Dec-2025 | Pukul : 15:30 , Selamat Siang !!
| Nama Ruas Jalan | 207 - KALIDUREN - SUMBER |
| No. Jembatan | KB.34.0004.0207.004 |
| Nama Jembatan | TEGAL DONON II |
| Kapanewon | Moyudan |
| kmpost | |
| Koordinat | -7.772427, 110.237561 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 9 m | 9 m | 9 m |
| Lebar | 14.3 m | 14.3 m | 14.3 m |
| Bentang | 2 | 2 | 2 |
Struktur Bangunan Atas |
|||
| Tipe | Pelengkung | Pelengkung | Pelengkung |
| Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
| Kondisi | 1 | 3 | 3 |
Lantai |
|||
| Bahan 1 | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan | Tanah biasa/ lempung timbunan |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 1 | 1 | 1 |
Sandaran |
|||
| Bahan 1 | |||
| Bahan 2 | |||
| Kondisi | 0 | - | - |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 3 | 3 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 3 |
KONDISI |
|||
| Nilai Kondisi | 3 (Rusak Berat) | 3 (Rusak Berat) | 3 (Rusak Berat) |
| Kerusakan | Dinding tegak diatas lengkung jembatan retak dan pecah,Tulangan pada abutment dan pelat lengkung jembatan berkarat | Penurunan mutu/retak pada bangunan kepala jembatan, | Retak dan pecah selimut pelengkung, besi berkarat pada pelengkung ,Aspal aus pada sistem lantai |
| Penanganan | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |