| Nama Ruas Jalan | 31 - KARANG TENGAH - MODINAN |
| No. Jembatan | KB.34.0004.0031.001 |
| Nama Jembatan | KARANGNONGKO |
| Kapanewon | Depok |
| kmpost | |
| Koordinat | -7.767876, 110.415221 |
| # | 2021 | 2022 | 2023 |
|---|---|---|---|
Dimensi |
|||
| Panjang | 80 m | 80 m | 80 m |
| Lebar | 4 m | 4 m | 4 m |
| Bentang | 6 | 6 | 6 |
Struktur Bangunan Atas |
|||
| Tipe | Pelengkung | Pelengkung | Pelengkung |
| Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
| Kondisi | 2 | 2 | 2 |
Lantai |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Aspal | Aspal | Aspal |
| Kondisi | 2 | 2 | 1 |
Sandaran |
|||
| Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
| Bahan 2 | Pipa baja diisi beton | Pipa baja diisi beton | Pipa baja diisi beton |
| Kondisi | 1 | 1 | 1 |
Kepala Jembatan / Pilar |
|||
| Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 3 | 3 | 1 |
Pondasi |
|||
| Tipe | Langsung | Langsung | Langsung |
| Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
| Kondisi | 1 | 1 | 3 |
KONDISI |
|||
| Nilai Kondisi | 3 (Rusak Berat) | 3 (Rusak Berat) | 3 (Rusak Berat) |
| Kerusakan | Pelat lengkung jembatan retak (B5 & B6),Penurunan mutu pasangan bata (Pilar 1 & 3) | Penurunan mutu / retak pada pasangan bata (Pilar 2 dan 3),Penurunan mutu/retak pada dinding pelengkung | Keropos pada selimut beton pelengkung,keropos pada abutment kepala jembatan |
| Penanganan | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |